Day 8: Using Horses as an organic tool
![]() |
| Meeting with Zuki the Engineer |
![]() |
| Fixing the foundation woods with steel cable bindings |
![]() |
| Current Binding System |
![]() |
| Wished-for Binding System - "Steel Ribbon" |
![]() |
| Cleaning the branches |
![]() |
| Making ropes for the cable binding |
Day 9: Starting the Roof Construction
![]() |
| Old Aerial Photo - Our Site is well-developed (upper right side, between the green and brown fields) |
![]() |
| Picking up long fresh branches for the top construction |
![]() |
| Wooden milk |
Days 10-11: Finishing Roof Construction part 1 (woods)
Day 12: Starting "The Fives"
Eucalyptus Texture Collection
![]() |
| Cleaning 4-5 cm diameter branches to be used as a base for the weaving |
Next time: Steel cable construction for the roof
Start weaving!




























.jpg)








