Locating plant of common reeds which has maximum length of reeds (~ 6 meters).
Cutting
or uprooting the longest reeds.
Cleaning the reeds from Foliage.
Loading
reeds on the car and drive it to the construction site.
Placing
the clean reeds in between the trees for
bending.
Improved form Created by a bow with overlap in order to get
a stable construction.
Create 12 foundation pits and Laying the 8 bows in them.
Started weaving between the arches.
Number
of Cattle Egret Sunbathing with a single Hooded Crow.
Snake sheds its skin which remains at the entrance to his cave, it form
remains complete.
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.