Spontaneous Architecture

design and build since 2005

Showing posts with label the sangam. Show all posts
Showing posts with label the sangam. Show all posts
6/02/2013

ASEE WORKING

›
Method One: Preparing connections from dry reed (sock).     Thread three connectors on each pair of reed which are intend...
1 comment:
5/25/2013

ASEE - Our First Day In The Field

›

5/17/2013

Asee - The Sangam Project - Weaving with common reed

›
Site Plan 1:200 Floor and Construction Plan 1:25   Roof Plan 1:25   1:25 Cross section A   1:25 Cross section B ...
4/29/2013

ASEE Group - The Sangam Reed Project

›
 Site Plan  Structure Floor Plan  Structure Roof Plan  Section  Building Process  Detail of the Bow  Fin...
4/20/2013

ASEE Group Working in the Sangam

›
›
Home
View web version
Powered by Blogger.