Showing posts with label Park Ariel Sharon. Show all posts
Showing posts with label Park Ariel Sharon. Show all posts
6/16/2013
6/10/2013
HumaNesting Construction - Days 4-5-6 (or: how to make a truck driver angry)
Bugger is bugging the branches into the truck
This is how you move a truck full of trees under a main highway (and partly break the truck's door)
Unloading the truck on site
1 flat tire
1 angry truck driver
1 partly broken truck door
Days 5+6: Making a Big Pit
Summary- Day 5
80-cm deep hole
~100 buckets of soil
First Test |
No Oil :-( |
The Warrior's Rest |
Summary- Day 6
120-cm deep hole
150-200 buckets of soil
1 new logo
6/01/2013
5/29/2013
HumaNesting Construcion - Day 2
A Guy on the Hill |
Desired way of transferring the woods to the construction site |
Starting collecting trees
Large, Long, Dry Woods |
Bye Bye Old Location
Hellooooo New Location
Reasons to choose the new location:
- An open, flat area, clearly visible from the bike path, the mountain, the sky and the surrounding roads (previous place was behind a 3-meter hill)
- More distant from the Ayalon river, hence possibly safer against floods
- Not on the bike path but next to it
- Better working area due to the closer shed which can be a temporary storage or shelter from the sun
- Location is in a small "No Man's Land" in the edge of the agricultural area, which is used neither for agriculture nor for anything else
Subscribe to:
Posts (Atom)